TEKBENCHES
  • Home
  • Store
  • Deliveries
  • Appointments
  • 2026 Catalog
  • About Us
  • brands
  • av

Hi Alex,

Junipero 2nd floor
Dusting stopped by and after talking about the project he come out with. good suggestion 
see Drawings below. 
(4) 6'x6' against the wall
(2) 6'x6' add on to the existing ones. 

I called the people back east that refurbish Steel case. 
They said they are usually running at 5-6 weeks plus 1 week shipping. 
Then we have Friant Novo Locally made in San Leandro around 4-5 weeks or sooner. 
Picture
Picture
Picture

Steel case Refurbished

Picture
Picture

FRIANT NOVO

Picture
THESE PICTURE IS AGAINST THE ANSWER CUBICLES AT STORY ROAD.
Picture
Open: Monday-Friday
From: 9:00am - 5:00pm
Saturdays: 10:00am -3:00PM (By appointment only)
PHONE: (408) 595-4238
EMAIL: [email protected]

​Show Room: 903N 9th St San Jose Ca, 95112
Warehouse: 928N 9th St San Jose Ca, 95112


AsssssCopyright © 2000 - 2024 Tekbenches All Rights Reserved
  • Home
  • Store
  • Deliveries
  • Appointments
  • 2026 Catalog
  • About Us
  • brands
  • av